Albania Steel Structure Warehouse :::

Albania Steel Structure Warehouse
<< Mobile Phone Scanning

Project Time: Aug. 2011

Project Location: Albania

Building area:3310m²

Project usage:structure workshop

Inquire

Product Description :::

Why Customers Choose PTH

The customer had a pretty good impression on PTH at the first contact. Being honest, pragmatic, calm and responsible  won a good reputation for PTH. 

Although there were language obstacles, both of parties could get to understand each other well by means of drawing, video, project case and translation software. Customer got to realize that PTH was very professional and dedicated in  prefab house industry.

Furthermore, in the subsequent cooperation, PTH’s timely feedback won great favor. In addition, PTH provided professional design plan, high-quality project case which enabled customers to fully trust us.

 

Project Description

The customer is a supplier of doors, windows and building materials in Albania. Products are mainly sold to neighboring  countries, such as Greece. He needed to build a new warehouse.

 

Project Features and Selling Points

Roof: we use 1025 color steel veneer with 0.5mm, glass cotton insulation with 50mm,aluminum foil and stainless steel  wire mesh

Wall: small corrugated PU sandwich panels with 50mm, horizontal panels, and different color as decoration to meet the needs of appearance

Day lighting roof + parapet structure

 

 

 

 

Logistics and Transportation

The total number of this logistics project reach 3800 pieces and weigh 136,600kgs total. All goods were delivered  between 30th April and 4th May. 

 

On-site Installation

During the installation session, PTH failed to send engineers due to visa problems, our engineer painted a reference drawing to help customers solve the roof board installation problem.

 

 